Notes

Briefings

Short notes for people preparing an equipment enquiry: what a specification has to contain, how to name a blowout preventer, and what happens to the message.

Briefings

Notes for people preparing an equipment enquiry

These are practical notes about specifying drilling tools and refinery equipment. They are not contract announcements.

  • What to put in a drill-pipe or bit enquiry.
  • What a well-control package has to name.
  • What happens to the message after you send it.
Driller's console with a weight indicator and pump controls

Why they exist

So the first reply can be a quotation

Most delays are a missing size, a missing connection or a missing standard.

  • Size

    Diameter, bore, pressure class or duty.

  • Standard

    The API, ASME or TEMA specification you require.

  • Quantity

    Joints, sets or pieces, and the place they must reach.

Read

Three notes

  1. 01

    Specification

    How to describe the tool so we do not guess.

  2. 02

    Well control

    Bore, pressure, rams, and what else is in the package.

  3. 03

    The message

    How an enquiry is stored and answered.

Or send the list you already have

A line list or a string sheet is better than a paragraph. info@edatm.com.

  • Attach the sheet.
  • Mark the lines you want quoted.
  • Say the date.

Send the specification, not a brochure request

Write to info@edatm.com or telephone +44 7570 624325. Replies go out on business days, Monday to Friday, 08:30–18:00.