Capability

Inspection and supply

Edatm supplies the equipment on the other eight lines, and the paperwork has to match the goods.

Supply

The goods and the papers are one delivery

Specifying a drilling tool or a piece of refinery equipment includes how it is checked and how it is moved. Edatm matches identity marks to the packing list, attaches mill and inspection certificates when the maker provides them, and plans the lift for heavy pieces. We would rather hold a dispatch than send a joint, a preventer or a valve with the wrong paper.

  • Tell us which certificates you require at the enquiry, not after the truck is booked.
  • Used equipment is described as used, with the inspection you want named.
  • We do not invent a test result to fill a gap.
A driller's console, the place the equipment ultimately has to work

Papers

What can accompany an order

Only the documents the maker or the inspector actually issues.

  • Mill certificate

    For tubulars and other mill products, when the mill issues one.

  • Material certificate

    For valves, fittings and pressure parts, to the type you specify.

  • Inspection

    Third party, if the order includes it, named before the visit.

  • Packing list

    Piece marks against the goods loaded.

The path

From message to delivery

  1. 01

    Read

    Look for a missing size or standard and ask.

  2. 02

    Quote

    Repeat the duty back, including what is excluded.

  3. 03

    Check

    Certificates and marks before dispatch.

  4. 04

    Move

    A lift plan for the weight, then the agreed delivery point.

Send the requirement with the enquiry

A certificate we have not been asked for will not be assumed.

  • Which standard.
  • Which papers.
  • info@edatm.com.

Name the equipment, the standard and the quantity

We will reply to say whether we can supply it.